Harrissety Construction
Princeton · New Jersey
Residential assembly laboratory / Princeton

Compose thewhole house.

Harrissety Construction Inc coordinates residential construction as an assembly of connected systems—structure, openings, enclosure, interior routes and finished space.

StructureFrame, beam, roof geometry.
EnvelopeOpenings, weather control, light.
InteriorServices, closure, finish readiness.
Large residential exterior shell under construction
Assembly 00 / exterior shell before window installation
01 / Assembly composer

Change one layer. Watch the entire system respond.

Choose a construction layer and adjust the field parameters to understand how each decision influences the building.

Double height timber framing

Structure defines the volume.

Wall lines, roof geometry, beams, openings and circulation become measurable before later layers restrict access.

Live specification

Open structurePrimary geometry remains fully visible for review.
02 / Section viewer

Read the house through different cuts.

Switch the active section to connect a real construction scene with the system it explains.

Long residential timber frame interior

Long structural bay

Repeated studs, joists and a large framed opening establish rhythm, span and daylight before interior closure.

03 / Dependency matrix

Five decisions that cannot be isolated.

Each system must anticipate the one that follows.

01

Geometry

Room proportion, wall lines, roof form and circulation establish the physical order.

02

Openings

Windows and doors influence structure, daylight, weather control and finish alignment.

03

Enclosure

Sheathing, roofing and transitions protect the building before interior work advances.

04

Services

Electrical, plumbing, ventilation and blocking must fit within the structural logic.

05

Finish

Final surfaces reveal the accumulated accuracy of every concealed layer beneath.

04 / Assembly records

Open a focused construction record.

Each record uses a different image and construction condition.

Double height residential framing
Record 01 / Volume

Double-height framing

Large openings, roof geometry and tall wall coordination.

Residential exterior shell
Record 02 / Shell

Exterior enclosure

Sheathing, roof and opening preparation.

Framed kitchen addition
Record 03 / Addition

Kitchen expansion

Vaulted framing, tools, services and windows.

Clean drywall interior finishing work without text or watermark
Record 04 / Interior

Interior transformation

Wall framing, circulation and finish preparation.

Questions from the assembly bench.

Bearing, alignment, openings, blocking, rough-in routes, insulation interfaces and all concealed conditions that influence later work.
They alter load paths, wall stability, daylight, fastening, flashing and the alignment of interior and exterior finishes.
Roofing, sheathing, weather barrier, openings, penetrations and transition details must form a continuous protection system.
Service routes, wall planes, ceiling conditions, openings, substrates and finish interfaces are coordinated and ready for final use.

Compose every layer.
Resolve the whole.

Harrissety Construction Inc coordinates residential work from structural volume to protected shell and finished interior, with each system prepared for the next.